A PROPOSAL TO: Mr. ALIT SELIMI

REGARDING : THE REMODELING OF THE BUILDING LOCATED AT 628 N. Gilbert , Danville Il

The following conditions shall govern this agreement:

Every reasonable effort shall be made to achieve a march 1st opening date, HOWEVER no guarantee exists; weather, alternate contractors, medical possibilities, etc establish Abeyond our/my control.

All work as described is qualified as USUAL & CUSTOMARY and accomplished within the terms; all work shall be performed in accordance with appropriate local & national guidelines & codes.

Payments shall be made to this contractor at approximately $10,000.00, increments, as they are incurred. More simply, a billing shall be/is determined by material purchase & labor costs, Justified by physical Realities of work actually accomplished: OR in the event of material expenses exceeding $10.000.00 within a one week period, a billing may occur upon reasonable justification, up to the amount necessary for expenses incurred, IF payment is made directly to the supplier or sub-contractor.

Work to be done or sub-contracted, at this contractors expense, SHALL BE:

the installation of

restaurant hoods & flues (exhaust), including make-up air

gas line for kitchen, but NOT the equipment quick connects

ceramic work to include one-side of the pass through window, the mens & womens restrooms, & the agreed upon floor areas: owner supplies tile & grout.

The repair of plumbing excavation to a reasonable expectation.

The installation of rug areas.

All iron work necessary for dining area.

All carpentry & payments for wood & wood products as discussed.

The installation of , & building of the counter cabinet, covered in formica, and the installation of stools, BUT does not include the counter top surface.

The installation of all restroom accessories but NOT the purchase of said Aaccessories@.

The organization of the project as much as is reasonably possible.

All ceilings as described, new tile in dining area/ old tile in kitchen.

all painting, staining, & varnishing.

The repair of damaged kitchen areas

finishing the new cooler , as necessary

EXCEPTIONS & EXCLUSIONS INCLUDE

Alterations to the roof surface of the building takes into consideration, the roof is several years old & consequently problems can occur, primarily due to age. SUCH AS: cuts into the material could result in tears/ material deterioration can result in poor adhesion/ winter weather can result in poor adhesion/ heavy equipment must be carried upon the roof which could create problems.

Reasonable care shall be used But problems which could occur because of conditions inherent to this work or requirements (roof problems) due to necessary work realities shall be considered EXTRA=S.

Work expected or required beyond the list of work to be done shall be charged at this contractors choice: either $15.00 per hour plus material costs, OR a rate equal to the sub-contract cost.

The front doors and rear door are subject to change, but are not a part of this contract.

The entrance front columns are to be wrapped in aluminum with simple painted wood crowns.

 

THE AGREED UPON PRICE IS $43,200.00

FORTY THREE THOUSAND AND TWO HUNDRED DOLLARS

TERMS & CONDITIONS to be met, NECESSARY, to break this agreement are: FAILURE TO PAY upon receipt of appropriate billing as outlined, within 3 working days.

Should BOTH sides agree We can no longer work together, due to TRUST issues BECAUSE: should the contractor fail to keep a reasonable working schedule, (this is determined by consultation with all contractors involved).

IF this contractor falls behind creating a problem for the other sub-contractors or owner NOT reasonably anticipated; alternate contractors may be hired, BUT the cost & the work shall be limited to either this contractors decision OR sufficient work to return to an acceptable schedule, ALL work sub-contracted under this heading shall be charged at Aa COMMON@ time & labor & material rate for this immediate area.

This contractor SHALL BE clearly informed and may select the work others shall do AND limit his cost to an agreed upon amount, defined by the heading REASONABLE & FAIR TO ALL.

 

 

I DO ACCEPT THE TERMS, CONDITIONS, AND JOB DESCRIPTIONS AND EXCLUSIONS AS OUTLINED HEREIN

BY MY SIGNATURE AFFIXED HERETO.

 

FOR THE CONTRACTOR JAMES F. OSTERBUR

 

 

FOR THE OWNER Mr. ALIT SELIMI

 

 

DATED________________________

WITNESSED__________________________________________________

 

contract is 3 pages

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Jim & Derek & Persons with respect